Progress Massing Diagram Study


This analysis is based on the Site study. As previously mentioned I made some changes to my massing model , I have rearranged the places of the programs. This way when visitor come in to the site , they will have a direct access to the lobby followed by gym/auditorium/restaurant facility. Hotel guests will proceed further down to the rooms and/or be able to access the spa which is located at the end of the hallway in the first floor. Some portion of the building is elevated 30 to 40 feet in order. All of the parts of the building are linked to each other , they will be accessible from the outside, as well. 